How Many Amps Does a Heat Pump Use? (2–5 Ton Chart)
Updated · By Dariusz
At a glance
- Planning estimate
- About 10 A per ton at 240 V
- Plan with
- MCA × 240 V from the nameplate
- Breaker size
- Up to the label's MOCP, often 20–60 A
- Backup heat strips
- 5–15 kW = 21–63 A at 240 V
A heat pump's amps are printed on the outdoor unit's nameplate as the minimum circuit ampacity (MCA), and that's the number to plan with on a 240 V circuit. Without the label, figure about 10 A per ton: roughly 20 A for 2 tons, 30 A for 3 tons and 50 A for 5 tons, a deliberately cautious estimate. The breaker follows the label's maximum (MOCP), usually somewhere from 20 to 60 A, and backup heat strips can draw more than the heat pump itself.1
How many amps does a 2, 3, 4 or 5-ton heat pump use?
Tonnage measures cooling capacity, not current, so two 3-ton units can carry quite different MCAs. Until you have the model number, use a planning estimate. EnoughAmps counts 2,400 VA per ton, which is 10 A per ton at 240 V. It's our rule of thumb, not a code value, and it's deliberately cautious:2
| Size | Estimate at 240 V | Calculation load |
|---|---|---|
| 1.5 tons | 15 A | 3,600 VA |
| 2 tons | 20 A | 4,800 VA |
| 2.5 tons | 25 A | 6,000 VA |
| 3 tons | 30 A | 7,200 VA |
| 3.5 tons | 35 A | 8,400 VA |
| 4 tons | 40 A | 9,600 VA |
| 5 tons | 50 A | 12,000 VA |
One ton of cooling is 12,000 BTU per hour, so a 36,000 BTU/h unit is 3 tons. Each size links to its own page, with backup heat strips and what fits on every panel size in our example homes.
Real nameplates often come in lower. One line of 2- to 4-ton split heat pumps cited by Berkeley Lab lists 18 to 29 A, and the example label below works out to 18.1 A.2 Once you have the model number, its MCA replaces any estimate by size, and backup heat strips come on top of it.
Read the nameplate, not the tonnage
Every outdoor unit carries a rating label. Two numbers on it matter for your panel:3
| Label | Meaning | Use it for |
|---|---|---|
| MCA | Minimum circuit ampacity | Planning load; multiply by 240 for VA |
| MOCP | Maximum overcurrent protection | The largest breaker or fuse allowed |
What the rest of the label means
- VOLTS 208/230, 1 PHASE. An ordinary single-phase home circuit. Load calculations use the 240 V nominal voltage, so VA = amps × 240.4
- COMPRESSOR RLA and FAN MOTOR FLA. The running current of the compressor (13.5 A) and the outdoor fan (1.2 A).
- MIN. CIRCUIT AMPACITY. 125% of the compressor current plus the fan: 1.25 × 13.5 + 1.2 = 18.1 A. That built-in margin makes MCA a cautious number to plan with.
- MAX. FUSE OR HACR BREAKER. The MOCP. It sits well above the running current so the compressor can start without tripping the breaker.
The example label works out to about 4,350 VA, less than our planning estimate even for 2 tons. That's why the label beats any rule of thumb.
What size breaker does a heat pump need?
The label decides. The breaker can't be larger than the MOCP printed on it, often shown as "MAX. FUSE OR HACR BREAKER", and the wire must be rated for at least the MCA.3 For the example label, that's a 2-pole breaker of up to 30 A on wire sized for 18.1 A or more. Your electrician picks the exact breaker and wire; Berkeley Lab puts residential heat pumps in a 20 to 60 A breaker range.1
- 2-pole, 240 V. Like a dryer's, a heat pump's breaker takes two spaces in the panel.
- HACR, when the label asks for it. The breaker must then be one listed for heating, air-conditioning and refrigeration equipment. Equipment has to be installed the way its label says.5
- Never bigger to stop trips. A breaker above the MOCP goes against the label. Repeated trips call for a service visit, not a larger breaker.5
- Strips get their own breaker, sized from the air handler's label (more below).
The heat pump's own breaker says nothing about whether your whole panel has room. That's the load calculation's job, and it's why adding up your breakers gives the wrong answer.
Heat pump voltage and electrical requirements
Most central and ducted heat pumps run on single-phase 240 V. Labels often read 208/230 V, meaning the unit is rated for either supply; 208 V is common in larger apartment and condo buildings. Load calculations use the nominal 240 V, so VA = amps × 240.4
A typical installation needs:
- A dedicated 240 V circuit for the outdoor unit: wire for at least the MCA, a breaker no larger than the MOCP.3
- A disconnect within sight of the outdoor unit, usually a small box on the wall next to it.6
- GFCI protection where your code edition requires it. The NEC® rules for outdoor outlets at homes cover HVAC equipment, and how they apply to heat pumps has changed between editions, so ask your electrician.7
- A second circuit for heat strips, if the air handler has them, sized from its own label.
- Two free spaces in the panel for each 2-pole breaker, and enough capacity, which is what the free check estimates.
Single-stage vs. variable-speed
A single-stage heat pump runs its compressor at full output or not at all. Two-stage and variable-speed (inverter) models slow down to match the weather, so most of the time they draw less than the label.
The panel math doesn't change, though: the NEC® calculation counts new heating and cooling at 100% of the nameplate rating, the most the unit can draw.8 Better compressors help indirectly, by leaning less on backup heat.
Don't forget backup heat strips
Many air handlers include electric resistance strips for very cold days. The Department of Energy notes they're added to cover a heat pump's shortfall in heating capacity, and that because they're inefficient their use should be kept to a minimum.9
Strips are rated in kilowatts on the air handler's label. Divide watts by 240 to get amps:
| Strip size | Amps at 240 V |
|---|---|
| 5 kW | 20.8 A |
| 10 kW | 41.7 A |
| 15 kW | 62.5 A |
The strips are on their own circuit, and the air handler usually has its own label with an MCA and MOCP for it.
How strips are counted
Under NEC® 220.83(B), new heating and cooling count at 100%, and 220.60 counts only the larger of the two because they never run together.8 In heating mode the heat pump and strips can run at once; in cooling mode only the heat pump runs. With the example unit and a 10 kW kit:
- Heating: 4,350 VA (heat pump) + 10,000 VA (strips) = 14,350 VA
- Cooling: 4,350 VA (heat pump only)
- Counted at 100%: the larger, 14,350 VA — about 60 A
Without the strips, the same system counts as about 18 A.
Cold-climate heat pumps and backup sizing
The Department of Energy notes that cold climates call for heat pumps designed to keep working at lower outdoor temperatures before switching to resistance heat. ENERGY STAR's Cold Climate designation requires, among other things, at least 70% of a unit's 47°F heating capacity at 5°F.10
For your panel, the logic is simple: the longer the heat pump carries the house alone, the smaller the strip kit it may need — and every 5 kW you skip is about 21 A you don't have to find. Lawrence Berkeley National Laboratory (LBNL) researchers list cold-climate heat pumps as one way to avoid high-power resistance backup.10
Some homes keep a gas or propane furnace as the backup instead (dual fuel). That takes strips off the panel, though it may not fit local air-quality goals.11
Replacing a furnace vs. replacing central AC
What the heat pump replaces matters as much as its size. Because only the larger of heating or cooling counts, a heat pump that takes over from central AC doesn't stack on top of it.
| Your home today | Effect on the calculation |
|---|---|
| Gas furnace + central AC | The AC comes off; the heat pump goes on in its place |
| Gas furnace, no AC | The full heat pump load is new |
| Electric furnace or baseboard kept as backup | Heating = heat pump + resistance heat, at 100% |
| Electric furnace swapped for smaller strips | The total can go down |
One detail surprises people. With no new heating or cooling, NEC® 220.83(A) puts an existing AC in the "all other loads" pile, most of which counts at 40%. A new unit switches the calculation to 220.83(B), which counts heating and cooling at 100% — so even a same-size replacement raises the number somewhat.12
What to ask your installer
Get these answers with the quote:
- The outdoor unit's model number, MCA and MOCP. These replace any estimate by tonnage.
- Whether the air handler will have heat strips, what size in kW, and the strip circuit's MCA and MOCP.
- Whether the strips can be staged or locked out above a set outdoor temperature — and whether your electrician and inspector will give that any credit in the load calculation. That's their call, not a given.
- Whether a cold-climate model would allow smaller strips, or none.
- Whether the existing AC circuit can be reused with the new unit's MCA and MOCP.
- Who does the load calculation for the permit, and which method they use.
What it means for your panel
LBNL notes that heat pumps often don't force a service upgrade because they replace existing air conditioning — but electric backup heat can.1 Electric ranges, dryers and an EV charger also eat headroom quickly.
Can you run a heat pump on a 100 amp service?
Often, yes. The worked example below is a 1,500 ft² home on 100 A service with gas cooking and drying, adding a 3-ton heat pump at our 7,200 VA default. It lands at about 70 A, which is green. Add a 10 kW strip kit and heating jumps to 17,200 VA, pushing the same home to about 111 A — over its 100 A service. Two example homes, one with gas and one with electric appliances, are worked out on can a 100 amp panel handle a heat pump.
How it shows up in the quick check
In the quick check, you pick the size in tons, counted at 2,400 VA per ton. A new heat pump replaces existing central AC or an older heat pump. Existing electric furnace or baseboard heat is assumed to stay as backup and is counted in full at a 10,000 VA default.
The quick check doesn't ask about new strips. If your quote includes them, use the breaker-by-breaker check: add a heat pump breaker and an electric heat breaker, mark both "Planned — not installed yet", and enter each nameplate rating in watts (MCA × 240 for the heat pump, kW × 1,000 for the strips).
For other panel sizes, see the heat pump overview. Follow each step in the load calculation guide, and if it doesn't fit, compare a panel upgrade or load management.
Technical notes
-
LBNL's 2024 technical brief says residential heat pumps generally need 20 A to 60 A breakers, often don't drive service upgrades because they typically replace existing air conditioning, and may need one when they use electric backup heating elements. Source: LBNL, Sizing Electric Service Panels (2024). ↩ ↩2 ↩3
-
2,400 VA per ton is EnoughAmps' default for an unknown nameplate; the code uses the actual rating. For comparison, an LBNL presentation lists one example line of 2- to 4-ton split heat pumps at 18 to 29 A maximum. Source: LBNL, Avoiding Panel and Service Upgrades (2023). ↩ ↩2
-
NEC® Article 440 requires multimotor equipment to be marked with its minimum circuit ampacity and maximum overcurrent device (440.4(B)). MCA is 125% of the largest compressor's rated-load current plus the other motors (440.33). The breaker may be up to 175% of the compressor current, or 225% if needed for starting (440.22(A)). Always use the values printed on your unit. Source: NFPA 70 (NEC®), free access. ↩ ↩2 ↩3
-
NEC® 220.5(A) has load calculations use nominal system voltages such as 120, 120/240 and 208Y/120 V. Source: NFPA 70 (NEC®), free access. ↩ ↩2
-
NEC® 110.3(B) requires listed or labeled equipment to be installed and used according to the instructions in its listing or labeling, which includes the maximum breaker size and type on an HVAC nameplate. Source: NFPA 70 (NEC®), free access. ↩ ↩2
-
NEC® 440.14 requires a disconnecting means within sight of, and readily accessible from, air-conditioning and refrigerating equipment, which includes a heat pump's outdoor unit. Source: NFPA 70 (NEC®), free access. ↩
-
NEC® 210.8(F) requires GFCI protection for outdoor outlets at dwellings, including outlets supplying HVAC equipment; the 2023 edition added a time-limited exception for listed HVAC equipment. Check which edition and local amendments apply. Sources: NFPA 70 (NEC®), free access; NFPA NEC enforcement maps. ↩
-
NEC® 220.83(B) counts new heating and air-conditioning at 100% of nameplate; where heating and cooling can't run at once, 220.60 counts only the larger. Source: NFPA 70 (NEC®), free access. ↩ ↩2
-
Source: DOE FEMP, air-source heat pumps. ↩
-
ENERGY STAR Cold Climate units also need a COP of at least 1.75 at 5°F. Sources: DOE FEMP, air-source heat pumps; ENERGY STAR, key product criteria; LBNL (2023). ↩ ↩2
-
ENERGY STAR describes dual-fuel systems that heat with a heat pump or a gas or oil furnace. LBNL notes fuel backup reduces the need for a panel upgrade but may be inconsistent with air-quality goals. Sources: ENERGY STAR, air-source heat pumps; LBNL (2024). ↩
-
NEC® 220.83(A) applies when no heating or cooling is added: everything, existing AC included, counts as the first 8,000 VA at 100% and the rest at 40%. 220.83(B) applies when heating or cooling is added and counts it at 100%, and 220.60 counts only the larger of the two. Source: NFPA 70 (NEC®), free access. ↩
Worked example · NEC® 2023 220.83(B)
A 1,500 ft² home on 100 A service with gas cooking and drying, adding a 3-ton heat pump
| General lighting and receptacles: 1,500 ft² × 3 VA | 4,500 VA |
| Kitchen small-appliance circuits: 2 × 1,500 VA | 3,000 VA |
| Laundry circuits: 1 × 1,500 VA | 1,500 VA |
| dishwasher | 1,200 VA |
| microwave | 1,500 VA |
| heatPump (heating/cooling) | 7,200 VA |
| First 8,000 VA at 100% | 8,000 VA |
| Remainder 3,700 VA at 40% | 1,480 VA |
| Heating and cooling at 100% | 7,200 VA |
| Demand ÷ 240 V | 69.5 A of 100 A |
Green — fits with room to spare · 31 A free
Will a heat pump fit on your panel?
Worked NEC® 220.83 results for two example homes, one with gas appliances and one with electric, on each service size.
- Can a 60 Amp Panel Handle a Heat Pump?Gas home 55 A · tight fitElectric home 90 A · over capacity
- Can a 100 Amp Panel Handle a Heat Pump?Gas home 62 A · fitsElectric home 98 A · tight fit
- Can a 125 Amp Panel Handle a Heat Pump?Gas home 69 A · fitsElectric home 104 A · tight fit
- Can a 150 Amp Panel Handle a Heat Pump?Gas home 76 A · fitsElectric home 111 A · fits
- Can a 200 Amp Panel Handle a Heat Pump?Gas home 84 A · fitsElectric home 119 A · fits
Free download
Panel Capacity Worksheet
A printable sheet to map your panel, list your big appliances and ask an electrician the 10 questions that matter before a quote.
Questions
What do MCA and MOCP mean on a heat pump?
MCA (minimum circuit ampacity) sizes the wire. MOCP (maximum overcurrent protection) is the largest breaker allowed. Neither is the running current, but MCA × 240 V is a good number for planning your panel.
How many amps does a 3-ton heat pump draw?
It depends on the model, so check the outdoor unit's MCA. Without the label, plan on about 10 A per ton at 240 V — 30 A, or 7,200 VA, for 3 tons. That is our cautious planning default, not a code value; many real 3-ton units are lower, and backup heat strips come on top.
Can I put in a bigger breaker if my heat pump keeps tripping?
No. The breaker can't be larger than the MOCP on the outdoor unit's label, and a bigger one would no longer protect the circuit the way the label requires. Repeated trips usually point to a fault in the unit, the wiring or the breaker itself, so call your installer or an electrician.
Do I need to count the backup heat strips?
Yes, if your air handler has electric resistance strips. They count at 100% as new heating, and a 10 kW kit alone draws about 42 A at 240 V — more than many outdoor units.
Does replacing a gas furnace with a heat pump add load?
Yes. The furnace used little electricity, so the heat pump is new electric heating counted at 100%. If it also replaces central AC, it takes the AC's place rather than adding to it, because only the larger of heating or cooling counts. Backup strips usually add the most.
Sources
- Purchasing Energy-Efficient Residential Air-Source Heat Pumps (U.S. DOE FEMP)
- Air-Source Heat Pumps (ENERGY STAR, U.S. EPA)
- Air-Source Heat Pumps Key Product Criteria, including Cold Climate (ENERGY STAR, U.S. EPA)
- Sizing Electric Service Panels and Utility Infrastructure for Residential Electrification (Lawrence Berkeley National Laboratory, 2024)
- Avoiding Panel and Service Upgrades (Lawrence Berkeley National Laboratory, 2023)
- NFPA 70, National Electrical Code® — free access (NFPA)
- NEC enforcement maps: which edition each state uses (NFPA)